EUindustrials EN DE ES

Country profiles

Finland, in preparationSweden, in preparationEstonia, in preparationDenmark, in preparationLatvia, in preparationLithuania, in preparationBelgium, in preparationCzechia, in preparationLuxembourg, in preparationSlovakia, in preparationAustria, in preparationHungary, in preparationRomania, in preparationCroatia, in preparationPortugal, in preparationGreece, in preparationCyprus, in preparationMalta, in preparationIrelandGermanyPolandNetherlandsFranceItalySloveniaSpainBulgaria
Profile In preparation Outside the EU

Country profile

Slovenia

Slovenia's €90m price relief runs from 2026 to 2028, and a separate decree compensates CO₂ costs for 2025 to 2027.

Key figures

Industrial electricity price
130.1 €/MWh
Day-ahead price, 2025 average
106 €/MWh
Renewables share, 2025
40.1 %
Negative-price hours, 2025
268 h
Electricity consumption (Agencija za energijo), 2025
13.2 TWh
Network costs, 20 to 70 GWh users (Eurostat), 2025
0.013 €/kWh

Sources: Industrial electricity price: Eurostat, nrg_pc_205, updated 19 Oct 2026, accessed 31 Oct 2026. Day-ahead price, 2025 average: European Commission, Quarterly Report on European Electricity Markets Q4 2025. Renewables share, 2025: BNetzA, REE, RTE, CBS, Agencija za energijo, Ember (2026 releases). Negative-price hours, 2025: BNetzA (5 Jan 2026), RTE (25 Feb 2026), TenneT (30 Apr 2026), GME annual report 2025, Agencija za energijo (30 Jun 2026). Electricity consumption (Agencija za energijo): Agencija za energijo, Poročilo o stanju na področju energetike v Sloveniji v letu 2025, table 5, 30 Jun 2026. Network costs, 20 to 70 GWh users (Eurostat): Eurostat, nrg_pc_205_c, 16 Oct 2026.

Policies

Price relief (CISAF 4.5)In forceSlovenia's ZSKREP relief pays energy-intensive firms part of their power costs for 2026 to 2028, with €90m of funding.What it means: An eligible site gets relief on up to half of its consumption, but must reinvest half of the aid. Both 2026 advances are due by 30 Nov 2026.

Relief under ZSKREP (SA.120965), €90m for 2026 to 2028, paid by Borzen. Requests for 2026 exceed the €30m budget, and both advances are due by 30 Nov 2026.

Slovenia's ZSKREP act implements CISAF section 4.5, and the Commission approved the scheme on 16 April 2026 (SA.120965) with an indicative budget of €90 million for 2026 to 2028. Eligible firms are in CEEAG Annex 1 sectors, have electricity costs above 5% of gross value added over three years, use at least 15 GWh a year and run ISO 50001 or energy audits. Aid covers at most half of a firm's consumption at up to half the reference price, without taking the price below €50/MWh, within a maximum aid per MWh that the government sets each year. Borzen, the market operator, decides on applications, pays two advances and settles against actual consumption by 30 April of the following year. At least half of the aid must go into new investment in renewables, storage, demand flexibility, efficiency, waste-heat recovery, electrolysers or electrification, operating within 48 months. Requests for 2026 exceed the €30 million budget, so any pro rata cut to the €30/MWh cap follows Borzen's review of all applications, and both advances are due by 30 November 2026.

Budget and maximum aid for 2026
€30 million; €30.00/MWh Vlada RS, sklep 00704-145/2026, Uradni list RS 627/2026, 15 May 2026
Reference price for 2026
€102.24/MWh (2025 average of the EEX-PXE Slovenian Power Base Year Future) Borzen, JP EI 2026, section 6.3, 29 May 2026
National eligibility tests
Electricity costs above 5% of gross value added; at least 15 GWh a year; ISO 50001 or energy audits ZSKREP, art. 2 and 3, Uradni list RS 12/2026, 17 Feb 2026
Both 2026 advances paid by
30 Nov 2026 Borzen, press release, 16 Sep 2026, 16 Sep 2026
Budget and maximum aid for 2027 set by
31 Jan 2027 ZSKREP, art. 11(1), Uradni list RS 12/2026, 17 Feb 2026

Source: Borzen, 16 Sep 2026

Legal texts: Borzen, spodbude za elektrointenzivna podjetja · ZSKREP (PISRS) · Akt o prispevkih OVE in SPTE (Agencija za energijo) · Pogoji za PSI (ELES)

CO₂ cost compensationIn forceSlovenia refunds part of the CO₂ cost built into power prices under a decree for 2025 to 2027.What it means: Claims for 2026 costs are due between 31 Mar and 30 Apr 2027. For 2025 costs the aid intensity is 0.728, against a maximum of 0.75.

Compensation for 2025 to 2027 under a March 2026 decree, run by the environment ministry. Claims for 2026 costs are due between 31 Mar and 30 Apr 2027.

Slovenia compensates indirect carbon costs in electricity prices under a government decree for 2025 to 2027, adopted on 12 March 2026 under State aid scheme SA.120932. A firm first applies to the ministry responsible for climate for a right to compensation, by 30 September 2027 at the latest, with a plan for spending it. It then claims the amount for each past year between 31 March and 30 April; claims for 2025 costs were due by 31 July 2026. The minister sets the aid intensity each year from the budget and the claims received, up to 0.75. Beneficiaries must cover at least 30% of their consumption from low-carbon sources and spend all the compensation on renewables, efficiency or emission cuts within two years of the last payment.

Claims for a year's costs
31 Mar to 30 Apr of the following year Uredba, Uradni list RS 61/2026, art. 8(1), 16 Mar 2026
Deadline to apply for the right to compensation
30 Sep 2027 Uredba, Uradni list RS 61/2026, art. 4(2), 16 Mar 2026
Low-carbon supply condition
At least 30% of the site's consumption Uredba, Uradni list RS 61/2026, art. 6(1), 16 Mar 2026

Source: Uradni list RS 61/2026, art. 8

Legal texts: Nadomestilo za posredne stroške emisij (gov.si) · Uredba 2025 in 2027 (PISRS)

Grid fee reliefIn forceEnergy-intensive users registered with Borzen's Centre for Support pay 30% of the standard renewables and CHP contribution.What it means: A draft decree would charge them €0.00185/kWh from 1 Jan 2027, half the general rate of €0.0037/kWh.

Energy-intensive users registered with Borzen's Centre for Support pay 30% of the standard renewables and CHP contribution. A draft decree would charge them €0.00185/kWh, half the general rate, from 1 Jan 2027.

Final customers pay a monthly contribution per kW of billing power to fund renewable and CHP support, at rates the Energy Agency sets for each user group. Customers in listed energy-intensive sectors pay 30% of the standard rate if their electro-intensity exceeds 5%, they use more than 1 GWh a year at the metering point and they are registered with Borzen's Centre for Support, among other conditions. On a medium-voltage feeder the standard rate is €3.44078 and the reduced rate €1.03223 per kW a month. A draft decree, open for comment until 13 November 2026, would replace this from 1 January 2027 with €0.0037 per kWh consumed, and €0.00185 per kWh for eligible electro-intensive companies.

Contribution on a medium-voltage feeder, standard / reduced
€3.44078 / €1.03223 per kW of billing power a month Agencija za energijo, Akt o prispevkih, art. 3 and 4, Uradni list RS 83/2024, 27 Sep 2024
Contribution on high voltage, standard / reduced
€2.97160 / €0.89148 per kW of billing power a month Agencija za energijo, Akt o prispevkih, art. 3 and 4, Uradni list RS 83/2024, 27 Sep 2024
Thresholds for the reduced rate
Electro-intensity above 5%; above 1 GWh a year at the metering point (three-year average) Uredba o načinu določanja in obračunavanja prispevkov, art. 6(3), Uradni list RS 184/2021, 26 Nov 2021
Draft rate from 1 Jan 2027, general / electro-intensive
€0.0037 / €0.00185 per kWh Ministrstvo za infrastrukturo in energetiko, 3 Nov 2026, 3 Nov 2026

Source: Agencija za energijo, Uradni list RS 83/2024

Legal texts: Predlog uredbe o prispevkih za OVE (gov.si)

Storage rulesIn forceA site that owns its battery pays no network charges or other costs on stored energy it exports or uses for grid flexibility services. A third party may install and run it.

Under the Electricity Supply Act (ZOEE), an active customer that owns a storage facility pays no network charges or other costs on stored energy it feeds back into the grid, and none on energy it stores or releases while providing flexibility services to system operators. Active customers include final customers that store self-generated electricity or take part in flexibility schemes, provided this is not their main business. A site may hand installation, operation, data handling and maintenance to a third party, which does not itself become an active customer. Separately, batteries connected directly to the high- or medium-voltage grid that only store and re-inject energy pay no network charges, including the connection-capacity charge, for three years from their use permit, if their connection consent is issued within three years of 12 July 2025.

Storage owned by an active customer
No network charges or other costs on stored energy fed back, or stored and released for flexibility services ZOEE, art. 23(7), Uradni list RS 172/2021, 29 Oct 2021
Third-party role
Installation, operation, data handling and maintenance may be transferred to a third party ZOEE, art. 23(3), Uradni list RS 172/2021, 29 Oct 2021
Batteries connected directly at high or medium voltage
No transmission, distribution or connection-capacity network charges for 3 years from the use permit ZOEE-A, art. 29 (ZOEE art. 109(6)), Uradni list RS 47/2025, 27 Jun 2025
Connection consent window for that exemption
Within 3 years of 12 Jul 2025 ZOEE-A, art. 46 and 52, Uradni list RS 47/2025, 27 Jun 2025

Source: ZOEE, art. 23 (Uradni list RS 172/2021)

Legal texts: ZOEE (PISRS)

Capacity mechanismNoneNo capacity mechanism. ACER's map of capacity mechanisms in the EU in 2025 shows none in Slovenia.

Slovenia has no capacity mechanism, and ACER's 2025 map of capacity mechanisms in the EU shows none in Slovenia. The Electricity Supply Act lets the ministry include a capacity mechanism in a plan to fix adequacy problems, subject to State aid rules and the Commission's opinion. A 2025 amendment added a legal basis for a non-fossil flexibility support scheme: the government sets an indicative target from the Energy Agency's flexibility needs assessment and may adopt a support programme, which Borzen's Centre for Support would run through annual calls funded by a levy on network bills. The Energy Agency published the first assessment, for 2030 and 2035, on 21 August 2026. We found no adopted programme.

Capacity mechanisms in the EU, 2025
None in Slovenia ACER, Security of EU electricity supply 2025, p. 12, 20 Nov 2025
Legal basis for a capacity mechanism
ZOEE art. 39 (optional, via an adequacy implementation plan) ZOEE, art. 39, Uradni list RS 172/2021, 29 Oct 2021
Legal basis for a non-fossil flexibility support scheme
ZOEE art. 44.a to 44.e, added in 2025 ZOEE-A, art. 23, Uradni list RS 47/2025, 27 Jun 2025
Flexibility needs assessment published
21 Aug 2026 (target years 2030 and 2035) Agencija za energijo, 21 Aug 2026, 21 Aug 2026

Source: ACER, Security of EU electricity supply 2025, p. 12

Legal texts: ACER, Security of EU electricity supply 2025

Next dated changeDated1 Jan 2027: the minimum billed capacity in time block 1 for sites above 43 kW rises from 15% to 20% of connection capacity. A draft decree would also charge the renewables contribution per kWh.

From 1 January 2027, sites with a connection above 43 kW are billed for at least 20% of their connection capacity in time block 1, the highest-priced block, instead of 15%; the floor rises to 25% from 2028. On the same date, a draft decree would replace the renewables and CHP contribution with a charge per kWh consumed. By 31 January 2027 the government sets the 2027 budget and maximum aid per MWh for the ZSKREP relief, and Borzen opens the 2027 call within ten working days. Recipients of 2026 relief report to Borzen by 1 April 2027, and Borzen settles 2026 aid by 30 April 2027.

Minimum billed capacity in time block 1, sites above 43 kW
20% of connection capacity in 2027; 25% from 2028 (15%, at least 8.6 kW, before) Agencija za energijo, Uradni list RS 753/2026, 26 May 2026
Draft renewables contribution from 1 Jan 2027
€0.0037/kWh; €0.00185/kWh for eligible electro-intensive companies Ministrstvo za infrastrukturo in energetiko, 3 Nov 2026, 3 Nov 2026
2027 relief budget and maximum aid set by
31 Jan 2027 ZSKREP, art. 11(1), Uradni list RS 12/2026, 17 Feb 2026
Settlement of 2026 relief
by 30 Apr 2027 ZSKREP, art. 6(5), Uradni list RS 12/2026, 17 Feb 2026

Source: Agencija za energijo, Uradni list RS 753/2026

Updates

Results for Slovenia follow once its eligibility rules are mapped to sectors

Checked 11 Nov 2026. Not legal, tax or investment advice.