Finland, in preparationSweden, in preparationEstonia, in preparationDenmark, in preparationLatvia, in preparationLithuania, in preparationBelgium, in preparationCzechia, in preparationLuxembourg, in preparationSlovakia, in preparationAustria, in preparationHungary, in preparationRomania, in preparationCroatia, in preparationPortugal, in preparationGreece, in preparationCyprus, in preparationMalta, in preparationIrelandGermanyPolandNetherlandsFranceItalySloveniaSpainBulgaria
Profile In preparation Outside the EU

Country profile

Spain

Spain has no EU price-relief scheme and lowers industrial costs through its electro-intensive statute and a 2026 toll cut.

Key figures

Industrial electricity price
104.8 €/MWh
Day-ahead price, 2025 average
66 €/MWh
Renewables share, 2025
55.5 %
Negative-price hours, 2025
Negative prices occurred; minimum −€15/MWh
Electricity demand (REE), 2025
256.086 TWh
Network toll, 6.1TD peak period, 2026
€26.785/MWh energy (P1) + €23.946498/kW per year power (P1)

Sources: Industrial electricity price: Eurostat, nrg_pc_205, updated 19 Oct 2026, accessed 31 Oct 2026. Day-ahead price, 2025 average: European Commission, Quarterly Report on European Electricity Markets Q4 2025. Renewables share, 2025: BNetzA, REE, RTE, CBS, Agencija za energijo, Ember (2026 releases). Negative-price hours, 2025: BNetzA (5 Jan 2026), RTE (25 Feb 2026), TenneT (30 Apr 2026), GME annual report 2025, Agencija za energijo (30 Jun 2026). Electricity demand (REE): Red Eléctrica, press release on Informe del sistema eléctrico español 2025, 11 Mar 2026. Network toll, 6.1TD peak period: CNMC Resolución de 18 de diciembre de 2025, peajes 2026, BOE-A-2025-26348, Anexo I, 22 Dec 2025.

Policies

Price relief (CISAF 4.5)NoneSpain has no CISAF price-relief scheme. The electro-intensive statute compensates part of the system charges instead.What it means: Only certified electro-intensive sites get compensation, and it covers system charges, not the power price.

No CISAF 4.5 scheme. The electro-intensive statute compensates part of the system charges instead.

Spain has no scheme under CISAF section 4.5, and none had been notified or announced by 8 October 2026. Instead, the electro-intensive statute pays certified sites a yearly grant. It covers up to 85% of the system charges that fund renewables, cogeneration and island systems, or 75% in lower-risk sectors. The 2026 call had €11.9m against €19.34m claimed, so awards were prorated. A reform approved by the Commission in July 2026 was not yet in the BOE in October.

Maximum grant intensity
85% of eligible charges (75% in 'riesgo' sectors) RD 1106/2020, art. 20.4 (consolidated, BOE), consolidated 2026-03-21
Eligibility ratio, 2026
consumption above 0.61 kWh per € of gross value added Resolución de 16 de enero de 2026, BOE-A-2026-1469, 21 Jan 2026

Source: BOE, RD 1106/2020 (consolidated)

Legal texts: Estatuto electrointensivo (RD 1106/2020)

CO₂ cost compensationIn forceSpain refunds part of the CO₂ cost built into power prices. The 2026 call covered 2025 costs with €600m.What it means: The 2026 call is closed, so eligible sites wait for the next call.

Indirect-cost compensation. The 2026 call (2025 costs, €600m) is closed.

Spain refunds part of the carbon cost passed into power prices to firms in sectors listed by the EU ETS Guidelines. From the 2026 call, the original sectors receive up to 80% of indirect costs and 22 newly added sectors 75%. The 2026 call covered 2025 costs, had a budget of €600m and ran from 30 July to 26 August 2026. Payments are prorated to the budget. The 2025 call paid out €597.9m.

Maximum aid intensity
80% (original sectors); 75% (added sectors) Orden PJC/678/2026, BOE-A-2026-14655, 7 Jul 2026

Source: BOE-B-2026-25588, 29 Jul 2026

Legal texts: Compensación de costes indirectos (RD 309/2022)

Grid fee relief2026 onlyCertified electro-intensive sites pay 80% less in network tolls until 31 Dec 2026.What it means: Unless the cut is extended, these sites return to full tolls in January 2027, five times what they pay now.

80% cut in network tolls for sites with the electro-intensive certificate, ending 31 Dec 2026.

For all of 2026, sites holding the electro-intensive certificate pay only 20% of network access tolls. The decree took effect on 22 March but applies from 1 January: the discount for the weeks before was credited separately on the first bill after that date. The cut applies to both power and energy terms, in every time period, and appears as a discount on the bill. No application is needed. It does not cover system charges. A State credit of €220m funds it. The measure has been renewed year by year since 2022, with gaps in 2025. Nothing is published beyond 31 December 2026.

Source: BOE, RDL 7/2026, art. 7

Legal texts: RDL 7/2026

Storage rulesIn forceSelf-consumption rules let the generator owner differ from the consumer and allow storage behind the same meter. Battery ownership is not stated.

RD 244/2019 allows storage inside self-consumption installations if it meets industrial safety rules and shares a meter with net generation, the boundary point or the consumer. Grid-connected batteries pay no tolls, and no charges on energy later fed back to the grid. A battery behind a consumer's meter is billed as part of that consumer's supply. In 2026 the CNMC confirmed that consumers may hold storage on their internal network. A draft decree on distributed storage is not yet adopted.

Storage demand access handled as flexible access
from 1 Sep 2026 (types 0 and 1) CNMC Resolución de 31.07.2026 (acceso flexible de demanda), BOE-A-2026-17571, 11 Aug 2026

Source: BOE, RD 244/2019, art. 5

Legal texts: Autoconsumo (RD 244/2019)

Capacity mechanismAdoptedOrden TED/966/2026: consumers and storage from 1 MW can take part. No auction has been called and no date is set.

Orden TED/966/2026 created Spain's capacity market, in force since 18 September 2026. Red Eléctrica will run pay-as-bid auctions for firm capacity. Generators, storage and consumers can take part from 1 MW, smaller sites through aggregation. Demand chooses contracts of one to ten years, capped at the site's lowest contracted power. Calls fall in stress hours, at most 10% of the year. The Commission estimates about €900m a year. No auction had been called by 3 November 2026.

Minimum firm capacity per installation or aggregation
1 MW Orden TED/966/2026, BOE-A-2026-19329, 17 Sep 2026
Stress hours
at most 10% of the hours in a year Orden TED/966/2026, BOE-A-2026-19329, 17 Sep 2026

Source: BOE, 17 Sep 2026

Legal texts: Mercado de capacidad (Orden TED/966/2026)

Demand responseIn forceSites cut load within 12.5 minutes when called; offers start at 1 MW, from one site or aggregated. H2 2026 cleared at €42.62/MW per hour; next auction 26 Nov 2026.

SRAD runs under P.O. 7.5 of November 2025, as amended in May 2026. Offers start at 1 MW, from one site above 1 MW or aggregated smaller sites. A unit must draw at least its awarded MW in every service hour. When called, it cuts load within 12.5 minutes for up to two hours, at most once a day. Availability is paid at the marginal price per MW and hour. By 3 November, SRAD had been called on 8 days in 2026. The next auction is on 26 November 2026.

Latest auction, 28 May 2026 (delivery 1 Jul to 31 Dec 2026)
1,775 MW at €42.62/MW per hour REE, nota de prensa SRAD segundo semestre 2026, 28 May 2026
Previous auction, 28 Nov 2025 (delivery 1 Jan to 30 Jun 2026)
1,725 MW at €65/MW per hour REE, nota de prensa SRAD primer semestre 2026, 28 Nov 2025
Next auction (delivery 1 Jan to 30 Jun 2027)
26 Nov 2026; requirement 2,405 MW REE e·sios, Publicación de la información referente al SRAD S1 2027, 26 Oct 2026
Activations since 1 Jul 2026
9 calls on 7 days, 15 Jul to 6 Oct 2026 REE e·sios, activaciones del servicio SRAD, accessed 2026-11-03

Source: REE, e·sios SRAD page (P.O. 7.5)

Legal texts: Servicio de respuesta activa de la demanda, P.O. 7.5 (BOE-A-2025-22853) · Modificación del P.O. 7.5 (BOE-A-2026-10602) · SRAD en e·sios: subastas y activaciones

Next dated changeDated31 Dec 2026: the 80% toll cut for certified electro-intensive sites ends; no extension has been published. No date is set for the first capacity auction.

Two 2026 measures end on 31 December 2026 unless extended: the 80% toll cut for electro-intensive sites and the freedom to change contracted power without the 12-month lock. No extension had been published by 3 November 2026. A reform of the electro-intensive statute, approved by the Commission on 31 July 2026, awaits publication in the BOE. No official date for the first capacity auction has been published.

Contracted-power flexibility ends
31 Dec 2026 Real Decreto-ley 7/2026, BOE-A-2026-6544, 21 Mar 2026
Commission approval of statute reform
31 Jul 2026 European Commission decision SA.123095, 31 Jul 2026

Source: BOE, RDL 7/2026, art. 7

What it means for you

Which measures apply in Spain depends on a company's sector and annual consumption

Checked 31 Oct 2026. Not legal, tax or investment advice.