Finland, in preparationSweden, in preparationEstonia, in preparationDenmark, in preparationLatvia, in preparationLithuania, in preparationBelgium, in preparationCzechia, in preparationLuxembourg, in preparationSlovakia, in preparationAustria, in preparationHungary, in preparationRomania, in preparationCroatia, in preparationPortugal, in preparationGreece, in preparationCyprus, in preparationMalta, in preparationIrelandGermanyPolandNetherlandsFranceItalySloveniaSpainBulgaria
Profile In preparation Outside the EU

Country profile

Germany

Germany's Industriestrompreis cuts power costs on half of eligible consumption until 2028, while grid fees change from 2029.

Key figures

Industrial electricity price
146.4 €/MWh
Day-ahead price, 2025 average
90 €/MWh
Renewables share, 2025
58.8 %
Negative-price hours, 2025
573 h
Gross electricity consumption, 2025
529.3 TWh
Transmission grid fee, average, 2026
2.86 ct/kWh

Sources: Industrial electricity price: Eurostat, nrg_pc_205, updated 19 Oct 2026, accessed 31 Oct 2026. Day-ahead price, 2025 average: European Commission, Quarterly Report on European Electricity Markets Q4 2025. Renewables share, 2025: BNetzA, REE, RTE, CBS, Agencija za energijo, Ember (2026 releases). Negative-price hours, 2025: BNetzA (5 Jan 2026), RTE (25 Feb 2026), TenneT (30 Apr 2026), GME annual report 2025, Agencija za energijo (30 Jun 2026). Gross electricity consumption: AG Energiebilanzen, Stromerzeugung nach Energieträgern 1990 bis 2025 (xlsx, row 'Bruttostromverbrauch inkl. PSE'), 7 Oct 2026. Transmission grid fee, average: Four TSOs, press release on preliminary grid fees 2026, 1 Oct 2025.

Policies

Price relief (CISAF 4.5)In forceGermany's Industriestrompreis pays back part of eligible industry's power costs for 2026 to 2028, with €3.8bn of funding.What it means: An eligible site gets relief on half of its consumption, but must reinvest half of the basic aid.

Sites in sectors the EU lists as at risk of relocation get part of their 2026 to 2028 power costs back the year after. On half of eligible consumption, the aid brings the 2026 reference price of €87.44/MWh down to €50/MWh. At least half the basic aid must be reinvested within 48 months of the grant decision.

Aid in 2026, on half of eligible consumption
€37.44/MWh BAFA programme page Industriestrompreis, undated, checked 6 Nov 2026
Application deadline, 2026
31 Mar 2027 (15 Jul 2027 with Strompreiskompensation) BAFA programme page Industriestrompreis, undated, checked 28 Sep 2026

Source: BAFA programme page

Legal texts: Industriestrompreis (BAnz AT 06.05.2026 B1)

CO₂ cost compensationIn forceStrompreiskompensation refunds part of the CO₂ cost built into power prices, and more sectors qualify since July 2026.What it means: Sites in the newly added sectors may now be eligible. Claims for 2026 costs close between 31 May and 30 Sep 2027; DEHSt has not set the date.

Strompreiskompensation, widened to more sectors in July 2026. Claims for 2025 costs closed on 17 Aug 2026; claims for 2026 costs close between 31 May and 30 Sep 2027.

The Strompreiskompensation refunds part of the carbon cost passed into power prices to manufacturers in sectors listed in the EU ETS State aid Guidelines. Under the July 2026 rules, 20 added sectors and 2 subsectors receive 75% of eligible costs for 2025 and the original sectors 80%. For 2026 costs the guideline sets 75% for all sectors and reserves a further amendment for 2026 to 2030. Applications for 2025 costs closed on 17 August 2026. The deadline for 2026 costs falls between 31 May and 30 September 2027 and is not yet set. Under the guideline in force, power claimed here cannot also count under the Industriestrompreis; no amendment had been published by 31 Oct 2026.

Aid intensity, 2025 costs
80% (original sectors); 75% (22 added sectors) Billigkeitsrichtlinie indirekte CO2-Kosten, BAnz AT 22.07.2026 B1, Nr. 7.2, 22 Jul 2026
Aid intensity, 2026 costs
75% (a further amendment for 2026 to 2030 is reserved) Billigkeitsrichtlinie indirekte CO2-Kosten, BAnz AT 22.07.2026 B1, Nr. 5.1 h and Nr. 2, 22 Jul 2026
Federal budget for applications in 2026
€4bn DEHSt, SPK verstehen, updated 2026-06-29
EUA price used for 2025 costs
€68.86/t DEHSt, SPK verstehen, updated 2026-06-29

Source: DEHSt, 19 Aug 2026

Legal texts: Strompreiskompensation

Grid fee reliefEndingDiscounted individual grid fees for large, steady consumers under §19(2) StromNEV end on 31 Dec 2028.What it means: Sites on these discounts lose them from 2029. The draft extends existing agreements to 2031 for sites above 10 GWh a year.

§19(2) StromNEV individual grid fees end on 31 Dec 2028. BNetzA's draft extends existing atypical-use and band-load agreements to 31 Dec 2031 for sites above 10 GWh a year.

Under §19(2) StromNEV, grid operators must offer individual fees to two groups. Sites whose peak falls outside the grid's high-load windows (atypical use) pay no less than 20% of the published fee. Sites drawing over 10 GWh a year with at least 7,000 full-load hours (band load) pay no less than 20%, 15% or 10%, depending on their hours. The ordinance expires on 31 December 2028. BNetzA's August 2026 draft keeps both discounts to 31 December 2031 for agreements in force at the end of 2028 that qualified at least once in 2026 to 2028. For atypical use it adds a test of average consumption above 10 GWh a year in 2024 to 2027, and freezes the discount at its 2024 to 2027 average. The draft is not final; BNetzA plans to adopt it in 2026.

Lowest possible fee, band load at 8,000 hours or more
10% of the published fee §19(2) StromNEV (consolidated), Stand 2023-12-22
Draft transition for existing agreements
to 31 Dec 2031 (draft) BNetzA, AgNes draft determination GBK-25-01-1#3 (draft, not final), 6 Aug 2026

Source: BNetzA, AgNes consultation

Legal texts: §19(2) StromNEV

Storage rulesIn force§118(6) EnWG: no grid fees on stored energy for 20 years if commissioned by 4 Aug 2029. The AgNes draft adds an investment-decision cut-off of 31 Dec 2026.

§118(6) EnWG exempts new storage from grid fees on the electricity it draws, for 20 years from commissioning. The plant must start operating by 4 August 2029. The exemption applies only to the extent that stored energy is fed back into the same grid. BNetzA's August 2026 AgNes draft would keep it only for projects with a final investment decision before 1 January 2027, proven by 31 March 2027. Other storage would pay new grid fees from 2029.

Exemption period
20 years from commissioning §118(6) EnWG (consolidated), current, retrieved 2026-10-08
Final investment decision cut-off
before 1 Jan 2027, proof by 31 Mar 2027 (draft) BNetzA, AgNes draft determination GBK-25-01-1#3 (draft, not final), 6 Aug 2026

Source: §118 EnWG

Legal texts: §118(6) EnWG

Capacity mechanismIn forceStromVKG tenders for capacity from Nov 2031. New storage can bid from 18 May 2027, or from 29 Dec 2026 with 10-hour output; flexible demand from 1 Dec 2027.

The StromVKG, in force since 22 July 2026, buys capacity to be available from 1 November 2031 and counts storage as a generation plant. Two 2026 tenders for new long-duration capacity, on 8 September and 29 December with 4.5 GW each, accept only plants that can feed in 80% of their capacity for 10 hours in a row, on 15-year terms. BNetzA awarded the first on 3 November 2026: 5,160 derated MW at a volume-weighted average of €155,296 per MW a year. A 2 GW tender on 18 May 2027 is open to all generation plants, including batteries, with no 10-hour rule, also on 15-year terms. Tenders on 1 December 2027 and 1 October 2029 add flexible demand and existing plants, with terms of one, seven or 15 years. Their volumes are not yet set.

Volume per 2026 tender (generation only)
4.5 GW BNetzA, Ausschreibungen nach dem StromVKG, Stand 2026-07-21

Source: StromVKG, 21 Jul 2026

Legal texts: StromVKG

Next dated changeDatedDec 2026: Industriestrompreis portal expected to open. End 2026: final AgNes decision expected.

Three dated steps are tracked. Registration on the Förderzentrale Deutschland portal is expected from December 2026, and applications for 2026 are filed in 2027. The deadline is 31 March 2027, or 15 July 2027 for firms also claiming CO₂ cost compensation. BNetzA plans its final AgNes decision for 2026 and has fixed 1 January 2027 as the date of announcement. On the draft, storage needs a final investment decision before that date to keep its grid-fee exemption.

Industriestrompreis portal registration opens
expected Dec 2026 BAFA programme page Industriestrompreis, undated, checked 6 Nov 2026
Industriestrompreis application deadline, 2026
31 Mar 2027 BAFA programme page Industriestrompreis, undated, checked 28 Sep 2026

Source: BAFA programme page

What it means for you

Which measures apply in Germany depends on a company's sector and annual consumption

Checked 31 Oct 2026. Not legal, tax or investment advice.