Finland, in preparationSweden, in preparationEstonia, in preparationDenmark, in preparationLatvia, in preparationLithuania, in preparationBelgium, in preparationCzechia, in preparationLuxembourg, in preparationSlovakia, in preparationAustria, in preparationHungary, in preparationRomania, in preparationCroatia, in preparationPortugal, in preparationGreece, in preparationCyprus, in preparationMalta, in preparationIrelandGermanyPolandNetherlandsFranceItalySloveniaSpainBulgaria
Profile In preparation Outside the EU

Country profile

France

France has no EU price-relief scheme, and its new capacity mechanism starts delivery on 1 November 2026.

Key figures

Industrial electricity price
97.9 €/MWh
Day-ahead price, 2025 average
65 €/MWh
Renewables share, 2025
27 %
Negative-price hours, 2025
513 h
Gross electricity consumption (RTE), 2025
446.2 TWh
Network costs, 20 to 70 GWh users (Eurostat), 2025
0.018 €/kWh

Sources: Industrial electricity price: Eurostat, nrg_pc_205, updated 19 Oct 2026, accessed 31 Oct 2026. Day-ahead price, 2025 average: European Commission, Quarterly Report on European Electricity Markets Q4 2025. Renewables share, 2025: BNetzA, REE, RTE, CBS, Agencija za energijo, Ember (2026 releases). Negative-price hours, 2025: BNetzA (5 Jan 2026), RTE (25 Feb 2026), TenneT (30 Apr 2026), GME annual report 2025, Agencija za energijo (30 Jun 2026). Gross electricity consumption (RTE): RTE, Bilan électrique 2025, principaux résultats, Feb 2026. Network costs, 20 to 70 GWh users (Eurostat): Eurostat, nrg_pc_205_c (electricity price components for non-household consumers), 16 Oct 2026.

Policies

Price relief (CISAF 4.5)None foundNo CISAF price-relief scheme found. France's CISAF scheme SA.122265 supports manufacturing investment instead.What it means: French support under the framework goes to investment projects, not to the power bill.

No CISAF 4.5 price-relief scheme found. France's €380m CISAF scheme SA.122265, open until 31 Dec 2030, supports clean-tech manufacturing investment.

We found no French scheme under CISAF section 4.5, which allows governments to cut the electricity price paid by energy-intensive users. France's CISAF scheme SA.122265 serves another purpose. It supports investment in the production of specified finished products, key components and raw materials. The budget is €380 million and aid can be granted until 31 December 2030. The decision was published in the EU Official Journal on 11 June 2026.

SA.122265 budget (investment aid, not price relief)
€380 million EU Official Journal C/2026/3108, 11 Jun 2026
SA.122265 aid may be granted until
31 Dec 2030 EU Official Journal C/2026/3108, 11 Jun 2026

Source: EU Official Journal C/2026/3108, 11 Jun 2026

CO₂ cost compensationIn forceCompensation carbone refunds part of the CO₂ cost built into power prices, and 13 more sectors qualify for 2025 costs.What it means: The 2027 finance bill, before Parliament, budgets €814m to keep it for 2026 costs.

Compensation carbone at 75% of eligible costs, extended to 13 more sectors for 2025 costs (decree of 2 Nov 2026). The 2027 finance bill budgets €814m for 2026 costs.

France refunds part of the carbon cost in power prices through the compensation carbone. Decree 2026-1021 of 2 November 2026 extends it to 13 more sectors, including organic chemistry and fertilisers, for 2025 costs; the government put that extension at €150 million for about 100 chemical sites. The aid stays at 75% of eligible costs. The decree fixes the emission factor at 0.51 tCO₂/MWh only for costs up to 2025, and the aid is now paid in the year after the costs, without an advance. The 2027 finance bill, tabled on 1 October 2026, keeps the scheme with €814.1 million for 2026 costs. Parliament has not yet adopted the bill.

Aid intensity
75% of eligible costs, 2021 to 2030 Décret n° 2026-1021 du 2 novembre 2026, art. D. 122-18, 2 Nov 2026
Budget for the 2026 extension (2025 costs) to organic chemistry and fertilisers
€150 million Assemblée nationale, written question 14875, ministerial answer, 7 Jul 2026
Chemical sites benefiting from the extension
about 100 Assemblée nationale, written question 14875, ministerial answer, 7 Jul 2026

Source: PLF 2027, Économie annex, 1 Oct 2026

Legal texts: Décret n° 2026-1021 du 2 novembre 2026 · Compensation carbone

Grid fee reliefIn forceTURPE 7 has reduced transmission tariffs for high-consumption sites since 1 Aug 2025.What it means: High-consumption sites on the transmission grid already pay lower network tariffs.

TURPE 7, in force since 1 Aug 2025, reduces transmission tariffs for high-consumption sites.

Sites that consume a lot of electricity with a stable, predictable or counter-cyclical profile pay reduced transmission tariffs. The reduction comes from article L. 341-4-2 of the Energy Code, with rates set by decree. The TURPE 7 transmission tariff, in force since 1 August 2025 for about four years, builds the lost revenue into RTE's tariff. CRE estimates the reduction at €311.0 million in 2025, rising to €532.3 million in 2028.

TURPE 7 HTB in force from
1 Aug 2025 (about four years) CRE deliberation 2025-39, 4 Feb 2025
Estimated value of the electro-intensive reduction, 2025
€311.0 million CRE deliberation 2025-39, table 48, 4 Feb 2025
Estimated value of the electro-intensive reduction, 2028
€532.3 million CRE deliberation 2025-39, table 48, 4 Feb 2025

Source: CRE deliberation 2025-77, 13 Mar 2025

Legal texts: TURPE 7 (CRE)

Storage rulesIn forceSince 1 Aug 2026, stand-alone storage in CRE-listed zones can opt for a storage tariff. Batteries combined with a consumption or production site, such as a factory, are excluded.

TURPE 7 adds an optional injection and withdrawal component for storage, available since 1 August 2026. It replaces the normal withdrawal charge and rewards charging or discharging against local grid peaks. It applies at HTA, HTB 1 and HTB 2 voltage, in network zones listed by CRE on 1 October 2025. Only stand-alone storage that draws from and returns all its energy to the public grid qualifies. Storage combined with a consumption or production site, such as a battery behind an industrial meter, is excluded.

Voltage levels eligible
HTA, HTB 1 and HTB 2 CRE deliberations 2025-77 (s. 4.4.2.4) and 2025-78, 13 Mar 2025
Storage tariff available from
1 Aug 2026 CRE deliberation 2025-77, s. 4.4.2.7, 13 Mar 2025
Eligible zones fixed
1 Oct 2025 CRE deliberation 2025-227, 1 Oct 2025

Source: CRE deliberation 2025-77, 13 Mar 2025

Capacity mechanismIn forceNew centralised mechanism (Décret 2025-1441). First auction held 6 Jul 2026; demand response and storage can take part.

France replaced its capacity mechanism with a centralised one run by RTE, set out in Decree 2025-1441. Production, storage and demand response can take part. The only auction for winter 2026 to 2027 was held on 6 July 2026. It cleared at €28,182.99 per MW and contracted 82,446.8 MW. A reserved 4,700 MW for low-carbon flexibility, meaning batteries, pumped hydro and demand response, cleared separately at €14,967.2 per MW.

Clearing price, delivery period 2026-27
€28,182.99/MW RTE, auction report for delivery period 2026/2027, 17 Jul 2026
Reserved low-carbon flexibility volume and price
4,700 MW at €14,967.2/MW RTE, auction report for delivery period 2026/2027, 17 Jul 2026

Source: CRE deliberation 2026-143, 9 Jul 2026

Legal texts: Mécanisme de capacité (Décret 2025-1441)

Next dated changeDatedThe first capacity delivery period runs from 1 Nov 2026 to 31 Mar 2027. The 2027 finance bill, before Parliament, budgets €814m to keep carbon compensation, covering 2026 costs.

The first delivery period of the new capacity mechanism runs from 1 November 2026 to 31 March 2027. Contracted capacity must be available over that winter, and the cost is passed to consumers through a tax based on consumption. Separately, the 2027 finance bill, tabled in the Assemblée nationale on 1 October 2026, keeps carbon compensation. Its budget annex sets aside €814.1 million for 2027, covering indirect costs incurred in 2026 at 75%, with a possible top-up for the most electricity-intensive companies. It does not say whether the 2026 extension to organic chemistry and fertilisers continues. Parliament has not yet adopted the bill.

First delivery period
1 Nov 2026 to 31 Mar 2027 RTE, auction report for delivery period 2026/2027, 17 Jul 2026
Carbon compensation budgeted for 2027 (2026 costs)
€814.1 million PLF 2027, Économie annex, programme 134, 1 Oct 2026

Source: PLF 2027, Économie annex, 1 Oct 2026

Updates

Results for France follow once its eligibility rules are mapped to sectors

Checked 31 Oct 2026. Not legal, tax or investment advice.